1. Road Work- NPCIL-Tarapur-TAPP 384 Colony (1,00,000M²)

a. Excavation
b. Murrum Filling
c. WBM-2 Layer (Oversize Metal)
d. Full-Grout- 75mm Thick
e. Footpath-with Kotak Stones
f. Kerbstone
g. Storm Water Drain in UCR

2. Road Work- MMRDA-Bandra-Infront Of Asian Heart (50.000M²)

a. Excavation
b.Murrum Filling
c. G.S.B
d. Wet Mix
e. D.L.C
f. P.Q.C
g. Hume Pipe Crossing
h. Cable Trench - RCC & Hume Pipe i. Pavement With Paver Blocks
j. Kerbstone-Big & Small Size

3. Road Work- MIDC-Mhape (25.000M²)

a. Excavation
b.Murrum Filling
c. WBM-2 Layer (Oversize Metal)
d. WBM-2 Layer (Size Metal)
e. Full Grout 75mm Thick
f.B.M
g. A.C
h. S.W. Drain-R.C.C. Built up Gutters i. Kerbstone
j. Footpath with metalling , P.C.C & Paver Block

4. Road Work- WPPIL-Kalyan-Near Metro Mall Junction (10,000M²)

a. Soiling-230mm thick
b. WBM- 75mm thick 2 Layer (Size Metal)
c. Paver Block

5. Pavement Work- WPPIL-Kalyan-Near Metro Mall Junction (5000M²)

a. Soiling-230mm thick
b. WBM-75mm thick
c. Paver Block
d. Erection of Street Light Poles
e. Retaining Wall-UCR
f. Rectification work done by the other agency

6. Development Works- BARC-Chembur-Swimming Pool Area

a. Retaining Wall-RCC
b. Water Supply Work
c. Under Ground Sewer Line Work
d. Compound Work with UCR, Angle Pols & Chain Link Fencing
e. SWD Work
f. Precast Cover fixing work
g. Area groding work-For Garding
h. Running Track Work-Rectification & Supply Of Circles

7. Development Works- ICARO Machines -Khopoli Factory ( 11,500M²)

a. Excavation
b. Soiling
c. WBM-75mm thick 1 Layer
d. Grid slab-M-20 with nominal reinforcement
e. Factory Work-RCC Footing, Columns
f. Compound Wall Work
g. SWD Work

8. Development Works- Adlabs Entertainment Pvt. Ltd.- Khopoli

a. Retaining Wall
b. SWD
c. Block Masonry
d. Soling Pavement
e. Eye Shape Planter-Block Masonry
f. Circular Planter-Block Masonry
g. Huge Step Blocks

Excavation at ISKON Temple Mira Road

Execution Dynamic: Quantum :8,00,000 Cu.m, Time Span : 6 months

Land Filling at Thane ( Valecha Engg.)

Execution Dynamic: Quantum :2,50,000 Cu.m, Time Span : 4 months Highlights

Excavation of Basement at Mira Road ( Jagruti Developers)

Execution Dynamic: Quantum :50,000 Cu.m, Time Span : 2 months

Excavation of Basement at Mira Road

Execution Dynamic: Quantum :65,000 Cu.m, Time Span : 2 months, Highlights : Carried on during Time Schedule

Excavation of Hill Cutting and Basement at Lodha Aqua Project Near Dahisar Check Naka

Execution Dynamic: Quantum :8,50,000 Cu.m, Time Span : 2 Years, Highlights: Double Basement, Hill Excavation

Excavation On Runway (N-3 & 09 Area ) at Mumbai Airport

Execution Dynamic: Quantum :20,000 Cu.m, Time Span : 2 months, Highlights: Excavtion Carried on during Time Schedule
Our Projects
Our Equippment
Sl. No. Name of Equipment Make Year of Manufacturing Qty. Location Work Condition
1 Excavator with Rock Breaker TATA 2018 2 Mumbai Excellent
2 Excavator Komatsu 2018 3 Mumbai Ok
3 Excavator with Rock Breaker Hyundai 210 2020 2 Mumbai Ok
4 Hydra ACE 2017/2018 10 Mumbai Ok
5 JCB Excavator JCB 2022/2023 5 Mumbai Ok
6 Pump Set Kirloskar 2010 3 Mumbai Ok
7 Water Tanker Tata 2016 2 Mumbai Ok
8 Rite Roller Asphalt BM Eng. 2018 3 Mumbai Excellent
9 Crane 10T TPH Tiger 2011 1 Thane Excellent
10 RMC Plant (Concrete Mixer Machine) Schwing Stetter 2012 3 Thane Good